SITEWORK DESCRIPTIONSTART ANT. COMP.
Douglas/Lucinda Douglas Demolition and Lucinda Road Extension 5/1/14 6/1/15
Stevens Renovation 5/12/14 6/15/16
Holmes Student Center Transit Plaza work (East side) 7/7/14 9/1/14
Watson Creek Bridge Remodel for Light Bus
Campus Wide Huskie Pup Route 7/15/14 9/1/14
Core Campus Core Lighting 7/21/14 11/1/14
Founders Library Exterior Improvements On hold
Normal Road Improvements 8/11/14 Complete
8/14/14
Alumni Plaza Improvements 8/15/14 9/1/14
Founders Library Sunken Terrace 7/14/14 11/1/14
Carroll Avenue Upgrade 8/15/14 8/22/14
MLK Plaza Upgrade 7/17/14 8/22/14
Lucinda Avenue Create Bikeway 7/25/14 9/1/14
East Lagoon Upgrade 8/1/14 9/1/14
Davis Hall Upgrade 7/7/14 10/1/14
Still Hall Improve Courtyard 7/17/14 9/1/14
Campus Wide Orientation Path Improvements 7/14/14 9/1/14
Campus Wide Electrical Infrastructure 6/23/14 7/31/14
Campus Wide Pursuing Emergency Projects 5/17/14 5/24/14
West Heating Plant (PC11) Replace two (2) 1200-ton chillers 10/15/14 12/2/14
Gabel Hall (PC11) Replace chilled water coils 6/10/14 In progress
Graham Hall (PC11) Replace 3 AHUs and 2 chilled water (Alt. in lieu of ECM 2.2) 7/7/14 8/19/14
DuSable Hall (PC11) Replace chilled water coils 6/10/14 In progress
DuSable Hall (PC11) Remove condensate tanks (Add) 5/13/14 Complete
5/20/14
Davis Hall (PC11) Replace chilled water coils 6/9/14 10/15/14
Campus Wide (PC11) Add to provide cube filter system for one AHU 6/13/14 8/4/14
Davis Hall (PC11) East Chiller Plant tie-ins 5/19/14 10/21/14
LaTourette Hall (PC11) East Chiller Plant tie-ins 11/11/14 12/1/14
Gabel Hall (PC11) Replace HVAC system in Cavan Auditorium 7/29/14 8/5/14
Gabel Hall (PC11) Provide new overhead ductwork distribution in Cavan Auditorium (Add) 6/9/14 8/13/14
Graham Hall (PC11) Provide plate fram HX 7/14/14 8/12/14
Graham Hall (PC11) Provide ECM motors and repair dampers in unit vents 7/1/14 In progress
Zulaf Hall (PC11) Remove two (2) 50-HP chilled water pumps and bases 6/15/14 Complete
8/1/14
Zulaf Hall (PC11) Remove chilled water branch piping for Cole Hall (Add) 6/15/14 Complete
8/5/14
Swen Parson South (PC11) Roof Replacement - Base 5/19/14 Complete
6/6/14
Adams Hall (PC11) Roof Replacement 6/9/14 Complete
8/4/14
Gabel Hall (PC11) Roof Replacement - Base 8/15/14 Complete
8/22/14
Davis Hall (PC11) BAS upgrades (excl ECM-2.4 ad 3.1) 6/9/14 Complete
6/20/14
LaTourette Hall (PC11) BAS upgrades (excl ECM-2.4 ad 3.1) 6/9/14 Complete
6/27/14
Huskie Stadium (PC11) Convert from steam to hot water (first floor only) 6/5/14 8/27/14
Campus Wide (PC 11) Replace street lighting (99 pole locations, 102 heads included) 7/28/14 10/3/14
Campus Wide (PC 11) Replace parking lot lighting (76 pole locations, 200 heads included) 6/9/14 In progress
S. Stevens & E. Montgomery (PC 11) Replace sidewalk lighting (8 pole locations, 8 heads) 7/22/14 Complete
7/31/14