SITEWORK DESCRIPTIONSTART ANT. COMP.
Bus Stops All bus stops 6/10/14 In progress
Bus turn around shelters Remove tape and old fliers from bus shelters 6/10/14 In progress
Between Stills and Altgeld Pressure wash sidewalks between the Stills and Altgeld 8/5/14 Complete
8/6/14
Still Hall Pressure wash mold if needed
Still Gym Still Gym pressure wash mold if needed under windows and fans
E. Heating Plant Pressure wash Base of NE wall (E. Heating Plant) 7/8/14 Complete
7/8/14
McMurry Pressure wash above entrance mold (W. Entrance)
Public Safety Pressure Wash south end wall - mold in shady area
Adams Pressure wash retaining wall west side of Adams
Williston Pressure wash ledges, retaining wall west side stairwells 
HSC Pressure wash roofline, bases of windows, Normal drive retaining walls, dock 
Founders Library Pressure wash sidewalks N. end and Benches, stairwell wall near courtyard shaded area  7/22/14 Complete
7/22/14
Neptune Pressure wash east entrance (housing and dining entrance) tour route entrance and exit at Neptune
Graham Pressure wash north side window ledge mold at Graham
Gabel Pressure wash computer lab wall (Gabel)
La Tourette Pressure wash front retaining wall and steps (LaTourette)
Fountain near Swen Pressure wash all concrete and benches (E. side Fountain near Swen)
Lowden Pressure wash lower window line mold, second floor patio
Lincoln HWY  NIU Entrance Pressure wash entrance pillars 7/3/14 In progress
Psych Math Stairwells   7/10/14 Complete
7/11/14
Iasbo Flower retaining wall 7/10/14 Complete
7/10/14
DuSable Main entrance 7/3/14 Complete
7/3/14
Lincoln Dock/entry  6/5/14 Complete
7/2/14
HSC  Sidewalk and bus stop
Neptune N Step/dock   6/6/14 In progress
Grant N  Dock/entry  6/2/14 Complete
6/20/14
Grant S  Entry  6/2/14 Complete
6/19/14
Stevenson N Entry / dock  5/15/14 Complete
6/26/14
Stevenson S Entry  5/15/14 Complete
6/30/14
New Residence Hall entry / dock 6/3/14 In progress
Visual Arts Art Building Kiln, SE balcony  7/9/14 Complete
7/15/14
Visual Arts Art Building N,S steps   7/9/14 Complete
7/15/14
Barsema Barsema lagoon
HSC MLK entrance 8/7/14 In progress
Lowden  Balcony
Campus Wide Steam Tunnel Vents
Lagoons Routine sweeping
Gilbert Hall Clean-up
Gabel SE lower wall
Founders Library Founders Pit
Normal Rd. Retaining walls
Williston S handicap  ramp
Campus Life Campus Life entry 7/18/14 Complete
7/21/14
Gilbert Monitor Area
Between Stills Stairs
Still Hall SW Wall
Visual Arts NW Wall 7/9/14 Complete
7/21/14
Zulauf Garden Area 7/17/14 Complete
7/18/14
Swen Parson West Handicap Ramp
Swen Parson East Handicap Ramp
Huskie Stadium East Side 7/7/14 Complete
7/16/14
Huskie Stadium West Entries
Yordon Main entrance
Soccer Dugouts Clean-up
Campus Wide Concrete Trash cans
Altgeld Kiosk Wash 7/16/14 Complete
7/16/14
Women's Resources E Wall, Patio, steps
McMurry Brick 8/15/14 Complete
8/15/14
Campus Wide Memorial Benches
Barsema Front & rear entrance 6/25/14 Complete
6/25/14