Featured Projects - NIU - Facilities Management & Campus Services

Architectural & Engineering Services

Featured Projects

Douglas Deconstruction and Lucinda Ave. Extension

Live web cam

Douglas Deconstruction and Lucinda Ave. Extension

Stevens Building Renovation

Live web cam

Stevens renovation
Stevens renovation
Stevens renovation
Stevens renovation







Sustainable Projects

2013 Parking Lot Improvements

Parking lots K, L, and N1

  • Permeable paving system (parking lots K, L, and N1)
    • Absorbs stormwater rather than allowing it to run directly into storm drains, detention facilities, or streams
  • Bioswales (parking lot N1)
    • Landscape elements designed to remove silt and pollution from suface runoff water
    • Slows down and treats runoff before gradually releasing it to surrounding waterwasy or storm sewer
  • LED lighting (parking lots K, L, and N1)
    • Reduced energy costs - an average of 50% savings
    • Longer life for lower maintenance and relamping costs
    • Mercury free and generates less heat